Academic Catalog 2018–2019

jump to navigation

Courses

PTE574 Artificial Lift Design

[3–0, 3 cr.]

The design and operation of well fluid artificial lift systems, including: sucker rod pumping, progressing cavity pumps, submersible electric pumps, down hole hydraulic pumps, gas lift, and plunger lift. 

Prerequisite(s): PTE322 Fundamentals of Reservoir Engineering.